Project Description

Reading Time: < 1 minute
Project ID: 40
Project:

Radar & Radio Navigation Systems — Leverage CMMI L2 Systems Engineering

Time 03/2007 - 12/2008
Duration: 03/2007 - 12/2008
Role: CMMI Dev. 1.2 consultancy; contact person on department and executive level for CMMI improvement activities.
Abstract: Reading Time: < 1 minute Leverage CMMI L2 Systems Engineering (Radar & Radio Navigation Systems).
Description:

The german R&D facility of an internationally leading technology company had the challenge to establish CMMI Level 2 system engineering processes for their radar, radio, and navigation systems development.

Five development projects were chosen within a gap analysis as pilots for improving the following process areas:

  • project management, planning and monitoring (PP, PMC),
  • quality management (PPQA),
  • requirements management/engineering (RD, REQM).

For these five pilots, my assignments as the CMMI consultant on-site were:

  • coordinate the on-site improvement activities with the international, corporate, CMMI program;
  • design, implement, and roll-out the local improvements: artefacts, roles, processes;
  • train and coach all team members in the new procedures.
Industry: Defense
QM Model applied: CMMI Dev. 1.2 Level 2
Size: 50 ppl. (Process Improvement Group & development projects).

: Virginia Guard Public Affairs, via flickr.com, .