• Radar & Radio Navigation

Project Description

Reading Time: 1 minute
Project ID: 40
Project:

Radar & Radio Navigation Systems — Leverage CMMI L2 Systems Engineering

Time 03/2007
Duration: 03/2007 - 12/2008
Role: CMMI Dev. 1.2 consultancy; contact person on department and executive level for CMMI improvement activities.
Abstract: Reading Time: 1 minute Leverage CMMI L2 Systems Engineering Project (Radar & Radio Navigation Systems)
Description: For the german facility developing radar, radio, and navigation systems for international armed forces five development projects were chosen within a gap analysis as pilots for process areas to be improved:

  • project management (PP, PMC),
  • quality management (PPQA),
  • requirements management/engineering (RD, REQM).

As the CMMI consultant on-site, my assignments were

  • coordinate the on-site, local, improvement activities with the international, corporate, CMMI program;
  • design, implement, and roll-out the local improvements: artefacts, roles, processes
  • train and coach all team members in the new procedures
Industry: Defense
QM Model applied: CMMI Dev. 1.2 Level 2
Size: 50 ppl. (Process Improvement Group & development projects).

: Virginia Guard Public Affairs, via flickr.com, .

This website uses cookies and third party services. Settings Ok

Spelling error report

The following text will be sent to our editors: