This page was exported from Plays-In-Business [ https://www.plays-in-business.com ]
Export date: Thu Apr 25 14:47:33 2024 / +0000 GMT

Radar & Radio Navigation Systems — Leverage CMMI L2 Systems Engineering




Project ID:40
Project:

Radar & Radio Navigation Systems — Leverage CMMI L2 Systems Engineering

Time03/2007 - 12/2008
Duration:03/2007 - 12/2008
Role:CMMI Dev. 1.2 consultancy; contact person on department and executive level for CMMI improvement activities.
Abstract:Reading Time: < 1 minute Leverage CMMI L2 Systems Engineering (Radar & Radio Navigation Systems).
Description:

The german R&D facility of an internationally leading technology company had the challenge to establish CMMI Level 2 system engineering processes for their radar, radio, and navigation systems development.

Five development projects were chosen within a gap analysis as pilots for improving the following process areas:

  • project management, planning and monitoring (PP, PMC),
  • quality management (PPQA),
  • requirements management/engineering (RD, REQM).
For these five pilots, my assignments as the CMMI consultant on-site were:
  • coordinate the on-site improvement activities with the international, corporate, CMMI program;
  • design, implement, and roll-out the local improvements: artefacts, roles, processes;
  • train and coach all team members in the new procedures.
Industry:Defense
QM Model applied:CMMI Dev. 1.2 Level 2
Size:50 ppl. (Process Improvement Group & development projects).

Excerpt: Leverage CMMI L2 Systems Engineering (Radar & Radio Navigation Systems).
Post date: 2007-02-11 15:12:18
Post date GMT: 2007-02-11 14:12:18
Post modified date: 2021-01-09 22:29:23
Post modified date GMT: 2021-01-09 21:29:23
Powered by [ Universal Post Manager ] plugin. HTML saving format developed by gVectors Team www.gVectors.com