Project Description
Reading Time: < 1 minuteProject ID: | 40 |
Project: |
Radar & Radio Navigation Systems — Leverage CMMI L2 Systems Engineering |
Time | 03/2007 - 12/2008 |
Duration: | 03/2007 - 12/2008 |
Role: | CMMI Dev. 1.2 consultancy; contact person on department and executive level for CMMI improvement activities. |
Abstract: | Reading Time: < 1 minuteLeverage CMMI L2 Systems Engineering (Radar & Radio Navigation Systems). |
Description: |
The german R&D facility of an internationally leading technology company had the challenge to establish CMMI Level 2 system engineering processes for their radar, radio, and navigation systems development. Five development projects were chosen within a gap analysis as pilots for improving the following process areas:
For these five pilots, my assignments as the CMMI consultant on-site were:
|
Industry: | Defense |
QM Model applied: | CMMI Dev. 1.2 Level 2 |
Size: | 50 ppl. (Process Improvement Group & development projects). |